Thursday, October 2, 2025

New IPO for Bitcoin Mining Space


Fermi (FRMI) is going Public at $21/Share, raising $682.5 (M) to build an 11 GW Private Power and Hyper Scale Data Center Campus in Texas.

It’s directly Targeting the Power needs of Fermi (FRMI), to Build an 11 GW Private Power and Hyperscale at the Center.

It’s directly Targeting the Power needs of Artificial Intelligence (AI) and Bitcoin Mining, Two Sectors constrained by Energy Supply, by offering Dedicated, Large-Scale, Behind-the-Meter Power Infrastructure.

With Tenants Lined-Up and Political Backing, it’s positioned as a Strategic Play at the intersection of Energy and Digital Infrastructure. AI and Bitcoin Mining, Two Sectors constrained by Energy Supply, by offering Dedicated, Large-Scale, BeHind-the-Meter Power Infrastructure.

With tenants lined up and Political Backing, it’s positioned as a Strategic Play at the Intersection of Energy and Digital Infrastructure.










NYC Wins When Everyone Can Vote! Michael H. Drucker


No comments: